Specifications include, but are not limited to: 1 Mobilization LS 1 2 General Conditions LS 1 Including all traffic control, labor, equipment, material, saw cut, demolition, disposal and incidentals required to complete the items listed below as detailed in the bid documents. This also includes any electrical, mechanical, plumbing, or access required for a complete and operating installation. 3 Traffic Control EA 1 4 Demolition (Sawcut, Remove & Disposal of Existing 8" Pavement) SY 200 5 Install High Early Strength Concrete Pavement SY 364 6 Remove 6" Unclassified Street Excavation CY 34 7 Install 6" Structural Select Fill CY 34 8 Install Concrete Flume & Curb Opening LS 1 9 Install 6" Structural Select Fill CY 47 10 Sealant Removal and Replacement LF 194 11 Install 4000 PSI Intergrated Curb (6") & Gutter LF 80 12 Remove existing passenger loading/Unloading zone sign& post EA 8 13 Install new accessible passenger drop of sign and post EA 2 14 Install new accessible pull-up space and strip w/4" solid white thermoplastic pavement markings lines LF 66