Specifications include, but are not limited to: preparation of plans and the construction management of desilting of Willow Fork of Buffalo Bayou. The preparation of plans will include establishing the original channel designed cross-sections from drainage reports and use of recent Lidar data to determine the amount of spoil to be removed. The drainage reports and Lidar data are to be provided by the Fort Bend County Drainage District. The construction management will consist of selecting a contractor and managing the excavation and hauling of spoils to established disposal sites. The upstream boundary of the project will be in the vicinity of Fry Road and the desilting will extend approximately 13,000 feet downstream along Willow Fork of Buffalo Bayou. The engineering firm herein referred to as “Respondent”. Respondent is responsible for complying with any and all Federal Emergency Management Agency (FEMA) rules and regulations.