Specifications include, but are not limited to: To install Eaton FERRUPS 3.1 kVA Uninterruptible Power Supplies (UPS) at eight (8) DART Communications Houses on the Light Rail Starter System. 1. UPS, Battery cabinet, batteries, and maintenance bypass switch shall be held/staged by contractor at an off-site location and packaged for each individual project site. Delivery to job site required. 2. Must use a Texas licensed contractor with local support and supervision based in Dallas, Texas. Must have previous experience installing Eaton FerrUPS systems and coordinating with Eaton FerrUPS engineers for installation of UPS systems. 3. Ability to hold weekly on-site project/management meetings. 4. Must include a startup report issued by Eaton Corporation. 5. Startup must be completed by authorized Eaton field service Engineer.