Specifications include, but are not limited to: 1. The proposal should provide the ability to upgrade additional bandwidth based on a per site as needed. The bandwidth increase options will include, but are not limited to, the following options. i. Proposal includes the ability to upgrade at a site with an additional 10 GbE connection with scalable or full bandwidth. ii. Proposal includes the ability to upgrade at a site with a 40 GbE connection with scalable or full bandwidth. 2. The proposal will provide a 10 GbE framed solution for the implementation term of the contract per site to the District NOC/DC. 3. The proposal may include a solution for NOC/DC to WAN_IPOP. 4. The proposal may include a solution for direct connectivity from the campus to the NOC and WAN_IPOP or can provide the campus connectivity through a ring-hub design to the NOC and WAN_IPOP. 5. The proposal will provide a solution that meets the near term and long-term design targets.