Specifications include, but are not limited to:. This project will consist of a feasibility study for the City’s Olympic Pool located at 601 Olympic Drive in Kerrville, Texas to be funded through the City of Kerrville, Texas Economic Improvement Corporation. The Olympic Pool was built in 1970 and has not seen significant improvements since. Most of the original infrastructure is still in place, and the facility is in need of renovation and general upgrades. The facility is outdated and is to be evaluated for basic needs and updates as well as feature and improvement recommendations based on current trends in aquatics (slides, interactive toys, “fun factor”, etc.), and the specific needs of the Kerrville community. At a minimum, the mechanical equipment and filtration system needs to be addressed in addition to evaluating pool leaks and other maintenance issues. The facility has inadequate storage, no designated first-aid room, no staff room / breakroom, no hot water, and no HVAC in the building.