The scope of the project is to provide different fender options for Wharf 1 at South Turning Basin Terminal, assist the Port Authority in selecting the best option, and to design the chosen fender system for Wharf 1. The selected Respondent is also expected to provide the following services: 1. Construction documents, (e.g., drawings, technical specifications, etc.) including, but not limited to, assistance in preparing competitive sealed proposals (CSP), competitive sealed bids (CSB), or any other solicitation packages for any Port Houston construction projects resulting from the design work of this Project. 2. Proposal and construction phase services in support of pre-proposal, preconstruction, and other meetings; review of submittals and shop drawings; responses to Requests for Information (RFI); assistance with change orders; and documentation of as-built archives.