Specifications include, but are not limited to: The project will consist of design services for the installation of approximately 17,500 LF of pipeline appropriately sized to convey raw water from two (2) newly commissioned brackish production wells to the BGD treatment facility. The first well is an existing test well (Test Well #1) which will be retrofitted as a production well and the second well is a newly drilled production well (BGD #14). The drilling and equipping of these two (2) well sites will be accomplished by separate design and construction contracts. The limits of this contract will commence at the boundaries of each of the two (2) well sites and terminate at a to-be-determined tie-in point on the main raw water conveyance line feeding the BGD treatment facility.