Specifications include, but are not limited to: The project includes the construction of the new Clear Creek Village Lift Station and abandonment of the existing Clear Creek Village Lift Station for the City of League City. The new Clear Creek Lift Station work includes, but is not limited to, an 8-ft diameter concrete submersible lift station wet well complete with two (2) 470 gpm, 7.5 HP submersible pumps and accessories, riser piping, valves, coatings, force main header, connection to existing 8-inch DIP force main, installation of 15- inch PVC influent sanitary sewer line and connection to the existing sanitary sewer with a new manhole, diversion/bypass pumping, site concrete pavement, fence, diesel emergency generator, odor control unit, electrical duct bank, conduit, wiring, starters, breakers, control panels, and all other associated electrical work; and all else specified and shown on the Construction Documents, complete in place, for a fully functional lift station.