Specifications include, but are not limited to: The vendor shall furnish all equipment, tools, labor, materials and incidentals necessary to clean, transport and properly dispose of all sediment and debris resulting, as needed and as required, from cleaning storm sewer inlets, pipes and boxes as listed in the Pricing/Delivery Information sheets. Work will be performed on an on-call basis for all HCTRA drainage systems and locations and will be directed by HCTRA. Vendors should be aware that this work may be located in and around confined work space and all workers will need to be confined space trained and perform safe working practices in accordance with Occupational Safety and Health Administration (OSHA) standards. Vendor shall also have the ability to video inspect storm drain to identify possible blockage or locations of infiltration. Verification of inlet, pipe and box cleanliness will be done on an as needed basis. All manifests and disposal records should accompany the invoice for all cleanings.