Specifications include, but are not limited to: The Capitol Complex Project Phase 1 consists of new construction as follows: 1.1. Package 3: A Central Utility Plant and associated infrastructure to serve the structures in Phase 1, and designed and sized to allow for future expansion to serve future Phases 2 and 3 when authorized and funded by the Texas State Legislature. 1.2. Package 4: A new state office building at 1801 Congress with five (5) levels of underground parking, and eight (8) levels of above grade parking on the east side. The building is approximately six hundred three thousand (603,000) square feet, and is fourteen (14) floors above grade. 1.3. Package 5: A new state office building at 1601 Congress with five (5) levels of underground parking. The building is approximately four hundred twenty thousand (420,000) square feet, and is twelve (12) floors above grade. 1.4. Package 6: A pedestrian mall and five (5) levels of underground parking between MLK Jr. Boulevard and 16th Street at what is currently Congress Avenue. 1.5. Note: Package 1 consists of mass excavation for the Project, and Package 2 consists of utility relocations.