Specifications include, but are not limited to: The selected contractor must provide all labor and materials required to remove and replace two (2) chill water pumps, isolation pads, concrete bases, VFD’s, and harmonic guards. Rework of the piping will be required to align with new chill water pumps. ONE pump is to be replaced at a time. The new pump shall be online, running, and commissioned before the second pump is taken out of services for replacement. Pumps are to be replaced during cooler weather where only one chill water pump is required to maintain building temperatures at a time. The base bid is to remove and replace two (2) chill water pumps located at University Center Tower (UCT). All work provided must be in accordance with the drawings and specifications provided by E&C Engineers & Consultant, E&C Project No.: 3627.00, dated July 01, 2019 Alternate #1: Remove and replace one (1) chill water booster pump on AHU 20-1. Piping shall be reworked to align with new booster pump. This booster pump is to be replaced simultaneously with one of the main building chill water pumps in the base scope of work. All work required for Alternate 1 must be in accordance with drawings and specifications provided by Shah Smith & Associates, Inc., SA Project No.: 1095-034-02, dated August 23, 2019.