Specifications include, but are not limited to: Improvements to the pavement at the Barge Dock parking lot. The objectives are to repair any damaged areas and to seal the surface of the parking lot. Scope of work includes cleaning and sealing the concrete around the existing bollard and cleat bases, removing and replacing damaged bollards, repairing damage to the concrete bulkhead cap, filling the underwater voids around the stormwater RC pipes in the bulkhead, repairing damage to concrete structures at two specific locations, removing and replacing damaged concrete pavement, repairing spalling in the pavement, cleaning and resealing expansion joints at the rampwall, between the bulkhead and pavement, at the seawall, and throughout the parking lot. Scope of work also includes installing 1.5” Type ‘D’ HMAC overlay over the existing concrete parking lot, parking lot striping, concrete bollards, concrete curb stops, a speed hump, and filling the void behind the seawall with flowable fill. Alternate No. 1 includes removing and replacing the damaged concrete pavement at the south end of the Barge Dock. Alternate No. 2 includes deducting the 1.5” Type ‘D’ HMAC from the base bid and installing 2” Type ‘D’ HMAC overlay over the existing concrete parking lot.