Specifications include, but are not limited to: 1. Pressure washing and removal of mold and mildew from all exterior areas including: - Stone wall surfaces - Brick wall surfaces - Building lettering - Metal canopies and framing - Curbs, sidewalks and paved areas 2. Paint: - Building ceiling soffits - Metal canopy framing - Doors and frames (exterior side only) - Ramp railings - Curbs - U Channel around door frame (on one storage trailer only) 3. Replace storefront glazing film (match existing) 4. Replace flag pole base 5. Install opaque glazing film on exterior of one window only (see drawing for location) 6. Install (3) LED lights at building entry (see drawing for location) 7. Remove unused fixtures/equipment on exterior surfaces except cameras. Get approval from DPS before removal of any fixtures/equipment.