Specifications include, but are not limited to: 1. Roof Upgrades: Complete re-roofing of entire building: removal of all materials, down to the lightweight concrete decking and installation of new insulation, cover board, a modified bituminous system, metal gutters and downspouts. 2. HVAC Upgrades: Terminal boxes and ductwork for new science labs; HVAC units for computer labs, Administrative area and Auditorium; New cafeteria lighting; New electrical upgrades. 3. Building Envelope Upgrades: Paint doors, pipe railing; metal cages, soffits and metal canopies, handrails; repair brick veneer. 4. Interior Improvements: Convert classrooms into 7 science classrooms/labs; Replace VCT flooring at hallways; Replace carpet at auditorium; ADA seating at auditorium; Millwork at administrative offices; Repair basketball boards and paint new school logo on gymnasium floor. 5. Sitework/Grounds Upgrades: New entry gate; Parking lot addition; New chain-link fence; Repair concrete sidewalk; Seal pavement cracks at playground area; New concrete ramp at north entrance; Repair concrete sidewalks.