Specifications include, but are not limited to: 3.1.1Vendor shall provide all necessary personnel, equipment, services, and materials required to deliver ReclamationServices at project site (see Appendix B Site Plan).3.1.2Vendor shall obtain necessary TPDES permits and implement a stormwater pollution prevention plan.3.1.3Vendor shall clear and remove vegetation.3.1.4Vendor shall excavate and segregate topsoil from designated areas.3.1.5When required by Work Order, Vendor shall create ingress and egress ramps into and from a subsidence openingfor use by people and equipment.3.1.6Vendor shall excavate the top three feet of soil around all edges of vertical walls to a slope of 1 to 1.3.1.6.1The top width of the resultant opening must be greater than the width of the subsidence opening and drift.