Specifications include, but are not limited to: Unit 1: 547 LF – 12” Water Line by Open Cut 16,963 LF – 8” Water Line by Open Cut 9 EA – 12” Gate Valve 101 EA – 8” Gate Valve 2,963 SY – 7" Conc Pvmt 2,030 SY – 2" Asphalt Pvmt Type D 3,079 LF – 6” Concrete Curb and Gutter 4,205 SF – 6” Concrete Driveway 13,207 SY – 11” Pavement Pulverization 12,711 SY – 3” Asphalt Pavement 2,633 SF – 4” Concrete Sidewalk Unit 2: 5,763 LF – 8” Sewer Pipe by Open Cut 31 EA –4’ Manhole 173 EA – 4” Sewer Service Unit 3: 18,653 LF – 6” Concrete Curb and Gutter 58,067 SF – 6” Concrete Driveway 35,072 SY – 11” Pavement Pulverization 33,128 SY – 3” Asphalt Pavement 11,673 SF – 4” Concrete Sidewalk Unit 4: 725 SY – 2" Asphalt Pvmt Type D 3,079 LF – 6” Concrete Curb and Gutter 4,205 SF – 6” Concrete Driveway 5,362 SY – 11” Pavement Pulverization 5,264 SY – 3” Asphalt Pavement 1,286 SF – 4” Concrete Sidewalk