Specifications include, but are not limited to: The proposed project involves construction at two water treatment plants. Work at the Southwest plant includes addition of tube settlers in two (2) 110’-6” diameter clarifiers, expansion of an existing filter building from 8 million gallons per day (MGD) to 12 MGD, and the construction of approximately 1030 feet of a new 24” diameter filter backwash line. Work at the Northwest plant includes replacement of tube settlers in two (2) 136’ x 28’ rectangular clarifiers. The project also involves installation of Supervisory controls and Data Acquisition (SCADA systems at both plants, and related appurtenances including control panels, filter controls, valves and actuators, wires, conduits, and instrumentation.