Specifications include, but are not limited to: Furnish and Install Lift Station - Will include at a minimum furnishing the structures, pumping units and motors, bases, guide rails, assemblies, odor control system, yard piping, onsite valves, onsite manholes, connections, 1” water service with meter box, hose bib assembly, fencing, clearing & grubbing, grading, onsite hydro-mulch, driveway, gates, bollards, site paving, all unclassified structural excavation and over excavation as required, all backfill, including embedment materials as specified, pump control panel and associated instrumentation, testing of the pump and motor units and providing a competent service technician during installation and testing for a complete installation in accordance with the Contract Drawings, including any items not specifically mentioned elsewhere.