Specifications include, but are not limited to: A review of existing information, a site reconnaissance, meetings with City of Denton operations and engineering, and development of a detailed project planning document addressing all phases of the project; A workshop with the City of Denton to review the project planning document and ensure that all parties involved clearly understand their roles and responsibilities; A baseline pipeline inspection using a combination of technologies and delivery platforms to address the appropriate level of risk to include: an electromagnetic (EM) and/or magnetic flux inspection using a long-range Robotic unit and/or a free-swimming delivery platform to assess the structural integrity of each pipe within the water main to estimate wall thickness loss and integrity of the bar wrap. Note: if a robotic approach is used, the vendor shall assure the City that its robot can inspect the full length of the pipeline. An alternative inspection may be conducted to identify and locate existing leak and gas (air) pockets (Alt 1);