Specifications include, but are not limited to: NovaSeq 6000 Sequencing System Integrated ultrahigh throughput system performing onboard cluster generation and sequencing. Computer and touch screen display, Data collection and analysis software, Instrument control computer. Base Unit: Portwell WADE-8022 with Intel i7 4700EQ CPU, Memory: 2 × 8 GB DDR3L SODIMM Hard Drive: None, Solid-State Drive: 256 GB mSATA, Operating System: Windows 10 Operating environment Temperature: 19°C-25°C (22°C ±3°C), <2°C change per hour Humidity: 20%-80% relative humidity, non-condensing, Altitude: Below 2000 meters (6500 feet) Ventilation: Maximum of 8530 BTU/h and average 6000 BTU/h. Laser Wavelengths: 532 nm, 660 nm, 780 nm, 790 nm Dimensions: W × D × H: 80.0 cm (31.5 in) × 94.5 cm (37.2 in) × 165.6 cm (65.2 in) with monitor Weight: 481 kg (1059 lb), includes 3.5 kg (7.8 lb) for leak tray and 0.9 kg (2 lb) for keyboard and mouse Power requirements 200–240 VAC 50/60Hz, 16A, single phase, 2500 W Dedicated 1 Gb connection between the instrument and data management system. Connect directly or through network Bandwidth for network connection 200 Mb/s/instrument for internal network uploads 200 Mb/s/instrument for BaseSpace Sequence Hub uploads, 5 Mb/s/instrument for Instrument Operational Data uploads. NovaSeq 6000 Warranty Upgrade: Silver Support Plan Year 1 warranty upgrade: Includes full coverage for parts, labor, and travel, Reagent replacement upon hardware failures; 1 PM; Remote Technical Support 18x5; 2 business day on-site response target*; control software and hardware updates; on-site applications support; discounts on advanced training; remote monitoring available. Contract Term: 12.00 months NovaSeq® 6000 Installation and Operational Qualification Installation Qualification (IQ) and Operation Qualification (OQ) provides documented proof that the instrument has been delivered, installed, and operating as intended and according to manufacturer specifications. It is required by many regulations and quality standards. It is required at initial installation, after relocation, or before start of regulated use.