Specifications include, but are not limited to: A. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF ANY EXISTING AND NEW WORK AND SHALL BE RESPONSIBLE FOR THEIR ACCURACY. ANY DIFFERENCES FOUND SHALL BE SUBMITTED TO THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. B. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE COORDINATION AND SCHEDULING OF THE CONSTRUCTION WORK, PROVISION AND CONTROL OF ALL MEANS AND METHODS OF CONSTRUCTION WORK, FIRE PREVENTION, COORDINATION, ORDERING, DELIVERING AND STORAGE OF MATERIALS, REMOVAL OF DEBRIS AND ALL ASPECTS OF JOB SAFETY. C. IF DEMOLITION IS REQUIRED TO INSTALL AN ITEM, THE CONTRACTOR SHALL RESTORE THE AREA TO PREVIOUS CONDITION, OR REPLACE DAMAGED ITEMS WITH NEW ITEMS TO MATCH EXISTING. D. PATCH ALL FLOORS, WALLS, AND CEILING PENETRATIONS AFTER REMOVAL OF PLUMBING, MECHANICAL EQUIPMENT AND ELECTRICAL PIPES, PREPARE FLOOR AND WALLS TO RECEIVE NEW FINISH. E. PATCHING OF WALLS AND HARD CEILINGS WILL INCLUDE REFINISHING ENTIRE SURFACE TO NEAREST TERMINATION POINT, CORNER, CONTROL JOINT OR EXPANSION JOINT.