Specifications include, but are not limited to: A contract for the construction of IOOF Cemetery Fence Replacement. Obtain all necessary permits to perform work. Inspect site, measure and bid all grade changes/elevations/step downs of concrete mow strip and fence panels accordingly. Demo, remove, haul off, and dispose of approximately 3,177 linear feet of existing chain link fencing, posts, and concrete footers. Install and maintain barricades on cemetery roads between blocks N/K, K/J, J/G, G/F, F/E, E/R, R/X, C/B, and B/A to prevent through vehicular traffic while existing fence and gate are removed and new concrete mow strip and fence are being constructed. Install and maintain proper work zone signage, barricades, and detour signage when closures of Highland or IOOF streets are necessary for worker and public safety in accordance with the Manual of Uniform Traffic Control Devices.