Specifications include, but are not limited to: 1 1 LS Mobilization (Max. 5% of Contract). Measurement and Payment shall consist of actual cost including: bonds and insurance, transportation and setup for equipment, transportation and/or erection of all field offices, sheds and storage facilities. 2 27,985 SY Surface Mill existing HMAC 0” to 3” Complete in place per City specifications. 3 4,349 Tons Furnish and install 2” Type “D” HMAC Complete in place per TxDOT Item 340. 4 1,775 Tons Furnish and install 3” Type “D” HMAC Complete in place per TxDOT Item 340. 5 200 Tons Furnish and install Type “D” HMAC level up Complete in place per TxDOT Item 340. 6 106 Tons Furnish and Install Portland cement at a rate of 20 lbs per SY to the existing base. 7 10,510 SY Cement stabilization 8” mixing with cement and existing material and compaction complete in place. 8 10,510 SY Furnish and install Chip Seal, complete in place per TxDOT Item 316 . 9 9,050 LF Furnish and Install standard curb and gutter per City of Greenville details and specifications complete in place.