Specifications include, but are not limited to: The Contractor shall be responsible for the installation and repair of Longitudinal Cable Barrier (LCB) systems within Region 1. The work to be performed under this contract shall be issued to the contractor in multiple work orders. Work Orders will consist of items of work to be performed. For each work order, the Contractor shall provide a continuous operation. A Continuous Operation is defined as the uninterrupted performance of call-out work on successive working days until the completion of all of the items of work specified in the work order (see Section 101.03 of the January 1, 2015 Standard Specifications for the definition of working days). LCB Repair and retensioning work shall include all labor, equipment, materials and incidentals needed to perform the work successfully. Current cable barrier locations are listed below. All installations are in medians.