Specifications include, but are not limited to: a. Receive, place, and compact MSW into the active areas of the landfill, b. Place daily cover (sufficient quantity available on site per Owner), c. Collect and dispose of all leachate, d. Conduct all required environmental monitoring not included in Item 5 (groundwater, surface water and methane), e. Maintain all environmental compliance permits (Title V, NPDES and Industrial Discharge), f. Perform any required landfill remediation activities, g. Provide dust and litter control, h. Provide maintenance of all site facilities, including haul roads and service roads, and i. Fund all necessary capital expenditures (equipment). ; a. Place final cover system, including 6” gas venting layer, geosynthetic clay liner, geonet drainage composite and 18” vegetative soil cover, b. Install erosion control and drainage features, c. Install landfill gas extraction system, including gas extraction wells, air supply lines, gas collection lines, condensate collection lines, d. Provide Construction Quality Assurance, and e. Submit appropriate closure documentation to TDEC.