Specifications include, but are not limited to: The scope of services for this project will include designing a greenway connection that extends the Northwest Connector Greenway along Third Creek Road from Western Avenue southward to Middlebrook Pike. Tasks will include coordination with TDOT’s Local Programs office throughout the NEPA, design, and ROW phases. Work will also include obtaining any necessary permits as well as No-Rise Certification or Letter of Map Revision in conjunction with the City’s FEMA Flood Insurance Program as needed. May include all or part of the following per TDOT Local Programs guidelines (Be advised of the required separation of duties and that each role may not have an interest, direct or indirect, in the lands being acquired): Project Design Design of a railroad crossing, including coordination with railroad owner Preparation and submittal of NEPA documentation Coordinate ROW acquisition as needed Obtain all necessary permits for the project Prepare bid specifications and construction plans