Specifications include, but are not limited to: A. In connection with Work performed offsite of the developer’s property, particularly property necessary to install off-site water and sewer facilities, take every precaution to avoid damage to buildings, grounds and facilities. The contractor shall be responsible to make all repairs of damage. Carefully remove and protect fences, hedges, shrubs, and other site items within construction limits. Reinstall hedges, shrubs, and other site items when construction is completed. All offsite easements shall be in place prior to beginning work. B. Grade, fertilize and seed grassed areas when construction is completed in accordance with requirements set out hereinafter in these Specifications. Restore property owners' facilities and grounds to as good or better than their original condition when construction is completed. C. Remove large trees, or other facilities within actual construction limits that cannot be preserved and replaced and only after receiving permission by the property owner. The Developer will assume responsibility for settling with any adjacent property owner for loss of said trees or facilities, damaged by the contractor. D. Support any foundations or structures adjacent to an excavation which is to be carried below bottom of foundation by shoring, bracing, or underpinning. Be responsible for damage to said foundation and structure. E. Do not store equipment of any kind outside easements without prior written consent of the property owner of land in easement. Be responsible for obtaining written approval from land owner and providing one copy to the City