Specifications include, but are not limited to: 1. New reinforced concrete pad for placement of a new emergency generator. 2. Demolition of existing piping and valves inside the station as shown on the Plans. 3. Demolition of existing MCC, SCADA panel, and other electrical appurtenances as shown on the Plans. 4. Three (3) new 6-inch, one (1) new 8-inch, and two (2) new 12-inch flanged butterfly valves. 5. Three (3) new 6-inch flanged tilting disc check valves. 6. New 8-inch flanged surge anticipator/relief valve. 7. New 12-inch flowmeter. 8. Miscellaneous flanged pipe and fittings required to install the new valves and flowmeter. 9. New motor control center with three (3) variable frequency drives, lighting panel, and other appurtenances as specified. 10. New 200 kW diesel fueled generator and 400A automatic switch