Specifications include, but are not limited to: Remove existing main level wood floor structure to prepare for new wood floor structure to be level with main entrance. 2.Demolish existing load-bearing structure supporting existing second floor joists to remain with new proposed load-bearing layout. Shoring work per the structural drawings will be required to be implemented. 3.Remove two existing wood stairs and infill second floor structure with new wood floor system. 4.Construct new wood stud partitions in designated areas, plumbing fixtures, gypsum and acoustical ceilings, lighting, and cabinetry in designated areas. 5.Install new split system HVAC equipment for proposed air handler rooms and roof top condenser equipment. 6.Patch and repair existing EPDM roofing in designated areas. 7.Provide electric water heater and plumbing fixtures per the drawings. 8.Provide new hardwood flooring on the lower level, ceramic tile floors and wainscot in the restrooms, carpet squares on the upper level offices, and ship-lap wall finishes for the lower level visitor’s center and director’s office.