Specifications include, but are not limited to: o It is the responsibility of the contractor to furnish and install plastic to cover exterior landscaping to contain dust and debris. o Provide and install one (1) layer of 3” EPS insulation, loose laid between flutes of the existing metal roofing system o Provide and install one (1) layer of .5” cover board over the 3” insulation, mechanically fastened to the existing metal roof system. o Provide and install a 80 mil TPO membrane in accordance with manufacturer’s specifications and details for mechanically fastened roof system, attached to the purlins of the existing structure o Flash all walls, curbs, and penetrations according to the manufacturer’s specifications and details o Eliminate the existing inside gutter by filling it with EPS and installing new roof drain inserts connected to the existing drainage pipe. o Provide and install crickets to push water to the new roof drain inserts. o Provide and install crickets behind all roof curbs to eliminate ponding water o Install TPO slip resistant walkpads in a path from roof hatch to all HVAC units o Provide and install 24 gauge pre-finished galvanized steel coping, and counter flashing.