Specifications include, but are not limited to: 1. Producing complete, TDOT approved, construction plans including right of way, utility relocation, traffic control, and other plans as required. 2. Environmental Document Preparation 3. Complete coordination with TDOT leading to a "Notice to Proceed" to the Construction Phase 4. Coordinating design and construction plans with applicable utilities in order to secure applicable permits and clearances necessary to proceed to construction. 5. Cost estimate preparation 6. Bid package preparation and bid phase assistance 7. Right-of-Way Acquisition 8. Preparation of Technical Specifications 9. Technical assistance during the construction phase 10. Data collection 11. Traffic Signal Timing and Fine-Tuning 12. Construction Engineering and Inspection (CEI) services