Specifications include, but are not limited to: furnishing, installing, and testing of approximately 5,070 linear feet of cured-in-place rehabilitation lining of existing 15" and 8" sewer lines; approximately 200 linear feet of open cut 8" gravity sewer; approximately 70 linear feet of 8" gravity sewer pipe by pipe bursting method; open cut and/or cured-in-place lining of existing 6" and/or 4" sewer services and appurtenances; reinstatement of 4" and/or 6" sewer services; 4" and/or 6" epoxied-on-saddles with stainless steel bands, connections to PVC, CIPP lining and PE pipe bursting pipe; sewer service clean-out assemblies and traffic rated clean-out boxes (if ordered), point repairs, including unclassified excavation, handling wastewater flows, backfill, tie-ins, reconnections, working in State Highway(s) and city streets, working in close proximity with other utilities and structures, testing, materials testing, restoration, asphalt pavement trench repair, and maintenance, and all other appurtenances and other work.