Specifications include, but are not limited to: 1. Demolition and removal of existing wet insulation and roof system areas determined by Infrared Scan down to the roof metal deck areas at the facility. 2. Removal of all existing sheet metal and all associated components to be replaced with new. 3. Repairs to existing roof deck assembly where damaged or deteriorated shall be performed using unit prices. 4. Where openings in the decks or where penetrations have been permanently removed, the repair to the deck is to match the material being repaired unless otherwise approved. These areas are to be included in the base bid work; 2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces. 3. Remove all existing fasteners utilizing mechanical drills and/or means to not damage the roof deck. 4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. 5. Maintain fire watch and portable fire-suppression devices during flame-cutting operations and/or torching or roof system. Fire watch shall be a minimum of 2 hours. 6. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing. 7. Remove all demolished items from roof in a manner to not damage exterior of facility and select locations determined by Owner.