Specifications include, but are not limited to: The demolition of Building A and Canopy are part of LEED Gold project to replace Building A. The Contractor shall recycle and or dispose of all material in accordance with LEED version 4 for BD+C New Construction and Major Renovation. LEED credits for this project are located in the Materials and Resource Section. The Contractor shall develop and maintain a Construction Waste Management Plan (CWMP) in accordance with this section. This record will be a deliverable at the substantial completion of the Project. All materials not recycled shall be disposed of, offsite, at a legal landfill. Contractor shall provide the receipt of transaction back to Metro Water Services as proof.