Specifications include, but are not limited to: provide all labor, materials not furnished by the OWNER, equipment and incidentals as required for installation of approximately 182 LF of 12-inch Polyvinyl chloride pipe (PVC) by dig and lay methods; approximately 103 LF of 15-inch Polyvinyl chloride pipe (PVC) by dig and lay methods; approximately 232 LF of 18-inch Polyvinyl chloride pipe (PVC) by dig and lay methods; rehabilitation of 489 LF of 8-inch pipe with Cured-In-Place-Pipe (CIPP); rehabilitation of 415 LF of 15-inch pipe with Cured-In-Place-Pipe (CIPP); installation of approximately 195 LF of 15-inch HDPE by pipe bursting methods; three (3) 5-foot diameter manhole replacement; new installation of one (1) 5-foot diameter manholes; abandonment of approximately 115 LF of 8-inch gravity sewer; abandonment of approximately 311 LF of 15-inch gravity sewer; abandonment of two (2) manholes; reconnection of sewer laterals; and all appurtenant and incidental materials and equipment, complete and in placed in accordance with the Contract Documents for said project.