Specifications include, but are not limited to: Remove AirCell Insulated Lines Hot & Cold Water Lines, Toilet Supply Line, Steam Line. Three (3) floors 30+ linear feet per line. An additional 4.5 feet per floor for toilet supply line. Remove Plaster Textured Ceiling 4.5’x 5’ = 23 sq ft x 4 bathrooms (1st & 2nd floor only). Owner will remove all electrical runs, conduit, fire alarms, etc., from ceiling prior to abatement. Tile Block Wall Demo Four & a half (4 ½) blocks wide, by seven (7) blocks up from black base block to provide access for abatement. One (1) floor will be done per day so the facility can relocate the inmates for that day. Owner will remove toilet and sink fixtures in each restroom prior to demolition and abatement. Waste will be manifested and disposed of at an EPA approved landfill.