Specifications include, but are not limited to: • Hwy #9 Elevated Water Tank: Repair, prep, clean, blast interior and exterior and paint/finish the interior and exterior surfaces of the tank as indicated or specified and as needed for a complete and proper installation. • Reservoir Painting and Repairs: • Chemical injection grout leaks in reservoir walls. Prepare, clean, paint/finish the exterior vertical concrete walls of the concrete reservoir tank. • Prepare, clean, paint/finish all of the exterior/exposed ductile iron piping, valves, pumps and motors on/around the reservoir. • Prepare, clean, paint/finish all of the exterior/exposed ductile iron piping, valves, pumps and motors on/around the well pump. • Replace handrail baseplate, electrodes, etc. • Building Painting and Repairs: • Remove existing resilient floor inside building (office/laboratory and bathroom). Assume floor tile contains asbestos. Properly remove and dispose of the tile floor. Paint concrete floors in laboratory/office, bathroom, electrical room and chemical room).