Specifications include, but are not limited to: Furnish and install 600 feet of 2" SDR9 HDPE water pipeline and miscellaneous appurtenances per drawings, from a point of connection at the existing 8" PVC waterline to the north on the adjacent camp lake jasper property to the proposed water meter location. All work shall be performed by a licensed utility contractor approved by Beaufort Jasper Water Sewer Authority (BJWSA) prior to construction Furnish and install 750 feet of 2" SDR9 HDPE sanitary sewer force main and miscellaneous appurtenances per drawings, from the point of connection at existing BJWSA manhole HD32- 024 to the proposed grinder pump station to be supplied by others. All work shall be performed by a licensed utility contractor approved by BJWSA prior to construction. Install a Simplex grinder pump station package complete, including connections from the sanitary sewer line from the building to the aforementioned force main. Provide electrical service from a circuit breaker in the building power panel to the pump station control panel. All work shall be installed by subcontractors licensed in their respective trades (utility, plumbing, and electrical)