Specifications include, but are not limited to: Richland County is requesting sealed and competitive bids from properly licensed system specific contractors to provide a new roofs for three fire stations. The contractor will audit the listed facilities and address the following in their bid: remove the existing roofing system and install a KEE-EPI roofing system and ensuring that the system meets all requirements listed below. Remove the existing roofing system, replace any damaged decking, install insulation to fill in flutes of metal panels (if required) as per manufacturer's specifications, install thermal insulation as per manufacturer's specifications and local codes, and provide a new Ketone Ethylene Ester (KEE) Ethylene lnterpolymer (EPI) based sheet roofing system that meets or exceeds ASTM D6754 with a 30 year material and labor warranty, and all required flashing and trim; while ensuring that the system meets all requirements listed below. The product to be used is FiberTite® FTR-XT 60 Mill or its equivalent (to be determined by Richland County Operational Services). 1. Mobilization, 2. Roof removal, 3. Roof preparation, 4. Roofing installation- Materials, 5. Roofing installation- Labor 6. Deteriorated decking 7. Project closeout.