Specifications include, but are not limited to: 1.1 General scope of work includes demolition of sections of the existing structure, construction of new walls and patching and painting of all walls in the designated area including all reconstructed walls. The demo and reconstruction will create space as indicated on the attached drawing. Demo and reconstruction includes electrical work including but not limited to disconnecting and removing current outlets, moving the electrical panel before renovation, move the electrical panel, install new outlets to support the planned renovation, and installation of 6 ceiling fans to be purchased by SCDHHS. 1.2 Successful contractor is responsible for all paint, supplies, labor, material, applicable taxes, equipment, licenses, and permits for all services as described in this solicitation. 1.3 This also includes the setup and removal of dumpster(s) sufficient for removal and cleanup of all debris from designated area. 1.4 Designated elevator will be available to contractor during on site work. 1.5 All new construction shall be completed in accordance with SC Building Codes using 2x4 aluminum studs, 16” on center using 5/8” drywall. All newly constructed walls will be anchored to the concrete flooring above. All newly constructed walls will be insulated with R13 insulation All walls will be finished with 7/8” white wall molding, where needed to provide The drawing of areas designated for demolition will be provided via transmission of the solicitation and at the scheduled site visit. 1.5.1 The room designated as the Multimedia Room (on attached drawing) is to have above the ceiling insulation in addition to the wall insulation. 1.6 The existing doors and doorjambs removed from the areas being demolished will be salvaged and installed on the offices that will be retained. The Successful Contractor will ensure that the doors and the accompanying frame will be kept together to ensure proper fit and conformity for re-use. Wall doorstops at all locations will be required to prevent the door(s) from damaging the wall. 1.6.1 There will be a sliding door entering the newly created breakroom (as indicated on the attached drawing). SCDHHS will supply the door and the selected contractor will be responsible for the install of the door.