Specifications include, but are not limited to: MOBILIZATION 1.000 LS BRIDGE CONSTRUCTION ACCESS 1.000 LS BONDS AND INSURANCE 1.000 LS CONSTRUCTION STAKES, LINES & GRADES 1.000 EA TRAFFIC CONTROL 1.000 LS CPM PROGRESS SCHEDULE 1.000 LS CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS REMOVAL & DISPOSAL ITEM NO. 001 1.000 LS REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 7,040.000 SY REMOVAL OF EXIST. GUARDRAIL 120.000 LF REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS UNCLASSIFIED EXCAVATION 10,832.000 CY BORROW EXCAVATION 11,751.000 CY MUCK EXCAVATION 4,254.000 CY GEOTEXTILE, SEPARATION 514.000 SY GEOGRID REINFORCEMENT (UNIAXIAL) 4,461.000 SY GEOGRID STABILIZATION 1,410.000 SY STONE BRIDGE LIFT MATERIAL 796.000 TON GRANULAR BRIDGE LIFT MATERIAL 1,400.000 CY FINE GRADING 9,649.000 SY FLOWABLE FILL 120.000 CY