Specifications include, but are not limited to: 1. Perform pre-construction meeting to discuss set up, staging area for equipment and loading of the roof, appropriate work hours, safety and production projections 2. Set up equipment, materials, safety lines at all roof perimeters and ground loading/dumpster area 3. Install new expanded polystyrene flute fill insulation over the existing metal panels. (loose laid and secured in place with overlay insulation) 4. Install new mechanically attached ½” wood fiber over the expanded polystyrene insulation. 5. Provide and install a mechanically attached 60 mil TPO roof system as directed. 6. Install new wood blocking at eaves as required by the roof system manufacturer for securement of perimeter flashings. 7. Install fully adhered curb flashings and covers for pipe and conduit penetrations. 8. Install new perimeter edge metal and flashings as required by manufacturer. 9. Install new gutter and downspouts.