Specifications include, but are not limited to: The City of Georgetown isseeking bidsfrom qualified and licensed general building contractorsto perform renovations at the restrooms located at the Kaminski House and on Screven Street. The renovation work at Screven Street restrooms includes the following: 1. Pressure wash metal roof, wood fascia and soffit, and exterior stucco walls. 2. Remove and dispose all plumbing fixtures, accessories, electric hand dryers, partitions, HM doors and frames, plastic wall panels, plywood ceiling. 3. Furnish and install new hollow metal doors, frames and door hardware. 4. Furnish and install new plumbing fixtures including faucets and flush valves. 5. Furnish and install solid plastic floor mounted toilet room partitions. 6. Furnish and install stainless steel grab bars. 7. Relocate electrical feed for hand dryers in both bathrooms. 8. Furnish and install stainless steel hand dryer. 9. Furnish and install stainless steel plumbing fixtures. 10. Furnish and install new toilet accessories (soap dispenser, toilet tissue dispenser, toilet seat cover dispenser) 11. Furnish and Install new channel‐frame mirrors. 12. Furnish and Install new drywall ceiling and paint. 13. Furnish and Install ceramic wall tile. 14. Paint doors and frames. 15. Furnish and Install new ceiling vent. 16. Install new LED ceiling light fixtures with motion sensor. 17. Install ceramic floor tile. Alternate: Seamless epoxy resin flooring. 18. Install baby changing stations. 19. Furnish and install new heating/ AC ductless heat pump. The renovations work at Kaminski House restrooms includes the following: 1. Remove and dispose all plumbing fixtures, plumbing accessories, electric hand dryers, plastic wall panels, heating units, and vinyl flooring. 2. Remove existing windows. 3. Scrape and paint steel window lintels. 4. Furnish and install new 36” x 53” double‐hung wood windows. 5. Furnish and install new sinks and faucets in both bathrooms. 6. Furnish and install new porcelain ADA toilets and toilet seats. 7. Furnish and install stainless steel grab bars. 8. Furnish and install new electric hand dryers. 9. Replace soap dispensers in both bathrooms. 10. Furnish and install new toilet accessories (soap dispenser, toilet tissue dispenser, toilet seat cover dispenser) 11. Add baby changing stations in both bathrooms. 12. Provide ceramic wall tile to 4’‐0” above finish floor. 13. Provide gypsum wall board. 14. Paint ceilings and walls in both bathrooms. 15. Provide ceramic tile floors in bathrooms and lobby. 16. Install door stops to both bathrooms. 17. Furnish and install new heating/ AC ductless heat pump