Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS REMOVAL OF EXIST. GUARDRAIL 150.000 LF BORROW EXCAVATION 1,736.000 CY EXCAVATION FOR SHOULDER PAVING 916.608 STA HAULING OF EXCAVATED SHOULDER MATERIAL 916.608 STA MAINTENANCE STONE 43.500 TON HMA SHOULDER WIDENING COURSE 4,583.040 TON LIQUID ASPHALT BINDER PG64-22 996.961 TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 4,350.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,255.000 SY MILLED-IN RUMBLE STRIP 17.360 MI HOT MIX ASPHALT SURFACE COURSE TYPE C 10,190.830 TON HOT MIX ASPHALT SURFACE COURSE TYPE D 1,900.000 TON DRIVEWAY PAVING-SURFACE TYPE D 581.875 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,604.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 3,000.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 183,820.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 120.000 LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 6,560.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 160,400.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,500.000 LF