Specifications include, but are not limited to: Remove and replace recovery board and the finish roofing. Clean all debris and prepare the surface for finish roofing. The existing roof system shall be visually inspected for conditions that may adversely affect adhesion of performance of newly installed products. All edges, drains, valley and through roof penetrations will be visually inspected and repaired as needed by project conditions. Clean gutters and check for necessary repairs Must use recovery board (no substitutions) Requirement: Screws 2 ½ inch minimum. Prefer 3 inch Flash all three (3) HVAC units Check for any other perforations in the roofing area. Provide supports for HVAC drain lines(will cover at pre bid meeting in detail) Remove and replace white flashing cap on wall at the front of the building area.