Specifications include, but are not limited to: A single contractor to provide all labor, equipment, materials, and supervision to remove (2) existing HVAC units and replace with (2) new 10 ton unit HVAC units on its Berkeley Campus located in Moncks Corner, SC. 1. Contractor shall provide all equipment, rigging, materials, labor, and supervision to remove existing HVAC units and replace with new 10 ton HVAC units and curb adapters. 2. The units being replaced are RTU #7 and RTU #8. The existing units have components located on the roof of the building. The building is a one story structure. 3. Contractor shall remove and dispose of the old HVAC units. 4. Contractor shall provide and install new HVAC RTU units with curb adaptors. 5. New RTU unit shall have, but not be limited to, the following features: 10 ton, 10.7Kw, 60Hz, 460V RTU Rooftop Heat Pump with Electric heat Approximate dimensions: 89”L x 59”W x 50-3/4” T Gross capacity @ ARI A point (Mbh): 122000 ARI net capacity (Mbh): 118000 EER: 11.0 IPVL: 12.4 Nominal CFM: 4000 Refrigerant: R-410A (2) scroll compressors Belt-drive centrifugal fan Ref: York Model XP120 “Predator” 10 ton with Luxaire XA-10 curb adaptor.