Specifications include, but are not limited to: 1. Permitting- Make application for permit with SC DHEC and ACOE 2. Demolition of existing fixed and floating docks at Bluffton Oyster Factory: o Demolition and Disposal of the existing floating 108+/- linear feet of floating dock (See Exhibit B- Existing Oyster Factory Dock). o Removal and salvage existing a 3’ X 24’ aluminum ramp to be re-installed on new fixed pierhead once completed. o Removal and disposal of 9 existing piling at floating dock. 3. Installation o Installation of stored salvaged components. See Exhibit C- Proposed Dock Configuration o The fixed pierhead is to be arranged as 2- 10’ X 30’ sections, placed side by side to create a 20’ X 30’ fixed pier. This pierhead is to be connected to an existing 16’ X 32’ fixed wood dock. X-Bracing will be required for 6 of the outer pile bents, using 3” X 8”, 2.5 CCA Marine Grade pressure treated SYP material.