Specifications include, but are not limited to: The South Carolina Department of Transportation (SCDOT) is soliciting bids On-Call Pipe Inspection. SCDOT’s current supplemental technical specification for Permanent Pipe Culvert, SC-M-714, allows the use of Reinforced Concrete Culvert Pipe (RCP), Corrugated Aluminum Alloy & Spiral Ribbed Aluminum Pipe (CAAP & SRAP), and Corrugated High Density Polyethylene Culvert Pipe (HDPE) in highway construction projects. For each type pipe, supplemental technical specification SC-M-714 mandates the material types, handling and storage, and installation, to include trenching, foundation, bedding, joints, and backfill. The current version of SC-M-714 is in the process of modification. The selected firm(s) shall be responsible for project management of the evaluation and reporting services as related to pipe inspection as outlined in the Scope of Work. Projects will be across the State. The scope of work for will include the following services as per supplemental technical specification SC-M-714 and all future updates: 1. Project Management -The firm/firms will be responsible for the project management of the evaluation and reporting services listed below. 2. Evaluation -The firm/firms will inspect pipe as required by RCE to ensure proper jointing, clear flow, and that line, grade, and deformations (if applicable) do not exceed allowable limits. 3. Reporting -The firm/firms will prepare and submit to the RCE a concise report of the evaluation results for all pipes evaluated detailing all defects discovered. The firm/firms will not be required to recommend remedial action for defects discovered. 4. Traffic Control -The firm/firms will provide the necessary Traffic Control in accordance with Department standards, to include the 2007 Edition of the Standard Specifications for Highway Construction, Supplemental Specifications, and Standard Drawings.