Specifications include, but are not limited to: A vendor to provide equipment, materials, and labor to install an oil/water separation pump station in North Charleston, SC. At a minimum, the vendor shall provide labor, equipment and materials to: 1. Install Grinder pump station (i.e. Liberty pump model: D3672LSG202). With control/alarm panel (i.e. Liberty pump model: AE24H=3) 2. Install all interior piping and discharge piping. 3. Install 600+/- LF of 2” diameter HDPE force main pipe from pump station to manhole in street. 4. Core manhole and install 2” force main per North Charleston Sewer district specifications. 5. Cut/patch road where the road is cut for the installation of the force main in to the manhole. 6. Test force main and put pump station into operation 7. After installation, ensure that area is restored in its original form by regrading and reseeding with grass.