Specifications include, but are not limited to: The project consists of furnishing all labor, materials, supervision and travel to undertake all necessary tasks. All work, materials, inspection, and testing will be to South Carolina Department of Transportation (SCDOT) Standard Specifications, latest revisions. FULL DEPTH PATCHING: All deep patching to be a minimum of 6 inches in depth. BACKFILL OF SHOULDERS AND GRASSING: Contractor shall provide and spread soil along the edge of the new paving course to provide a graded taper to the existing shoulder where pavement edge is more than 2" above the existing shoulder. The tapered soil should generally be from 1' to 2' wide, and shall be free of refuse, roots, heavy or stiff clay, excessive mica, or stones over one inch in size. Finished shoulder fill shall be seeded with seasonal mix as specified by Section 810 of the SCDOT Specifications for Temporary Vegetation